Laserfiche WebLink
INSPECTION REPORT _ <br /> @4L77- <br /> Date: ''- t o Permit <br /> Contractor: <br /> Owner: <br /> Site Address: S �' �� <br /> TYPE OF INSPECTION R QUESTED <br /> ELECTRICAL ILDIN MECHANICAL PLUMBING <br /> E]Temp Service R ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ElGas Pipe Final ElHWWT Final <br /> OTHER OR CONSULTATION: � lJ_ ` -77S '217�`-'-7 Q. .—1 <br /> APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> ------ <br /> --- / f <br /> Inspector Date: <br /> E I R( !C N/3Tt RE FORMS S PROMOTIONS .425/488-8900 <br />