Laserfiche WebLink
INSPECTION REPORT <br /> Date: IZ I Permit: <br /> Contractor: V V U Q �QG <br /> Owner: �t rW I l <br /> Access U0LO SE F—\kr� NI o i <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> SUlectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final El Gas Pipe Final (j I—ElHWT Final <br /> OTHER OR CONSULTATION:� Q V( �2�• 7V-�f�'� A 7 <br /> rj(hPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER IT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> v V <br /> Inspector: Date: <br /> EIR(4/09) ro s c PROMO r Ns• 425/4811-89110 <br />