Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: <br /> L?Lov--z ' <br /> Contractor: S <br /> Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Groundin ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> g ❑Drywall Nailing ❑Plumbing Final <br /> Fi al ❑Shear Nailing GAS PIPE <br /> SITE W ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid (]Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas ipe Final <br /> Ll HWT Fl <br /> OTHER OR CONSULTATION: & w&A �� ww <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice requiyed <br /> 10 Inspector: Date: <br /> EIR(4/09) TA F*1.0..T..0N1•425/488-8980 <br />