Laserfiche WebLink
INSP CION REPORT <br /> _� �& <br /> Date: Permit: <br /> Contractor: [A is <br /> Owner: L "fit <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI PER <br /> K FOR T.C.O. F1 CORRECTION REQUESTED <br /> ❑ OK FOR C.O. [:1VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> -�--` 4-> Acf <br /> Inspector: Date: l <br /> EIFt(4/0i) kms,. FOR &PROMOTIONS•425/488-8900 <br />