My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY DOLLAR TREE 2016-08-22
>
Address Records
>
EVERGREEN WAY
>
7601
>
DOLLAR TREE
>
7601 EVERGREEN WAY DOLLAR TREE 2016-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 9:43:49 AM
Creation date
8/22/2016 9:43:46 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
DOLLAR TREE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/30/2016 Page 1 <br /> City of Everett <br /> 2:01:04PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P1504-018 Site Address 7601 EVERGREEN WAY <br /> Applied 4/22/2015 Applicant Lot <br /> Approved 4/22/2015 Owner COLUMBIA CASCADE PLAZA LLC Block <br /> Issued 4/22/2015 Contractor PLUMBING PRO'S LLC Tract <br /> Parent Permit No. B1503-048 Description INSTALL SUBMETER,WASTE&WTR LINES-DOLLAR TREE <br /> Notes REMOVE FIXTURES,INSTALL SUBMETER,WASTE PIPE,WATER LINE FOR FUTURE USE <br /> ADD ON:MAKE SEWER&STORM LINES PVC <br /> (6/18/2015 1:16 PM TAH) <br /> ADD PLBG FOR INTERIOR REMODEL FOR DOLLAR TREE <br /> Scheduled Completed Tvoe Inspector Result Remarks InsDector's Comments <br /> 5/12/2015 5/12/2015 PlbgGrWork DXW PartialApproval See notes 14"roof drain groundwork OK pending <br /> letter from engineer stating only I roof <br /> drain and where are the over flows Contact <br /> plans examiner Steve Miller. <br /> 5/13/2015 5/13/2015 PlbgGrWork DXW PtAppr-CorrReq See notes 25 feet of future drain for sanitary sewer for <br /> bathroom. <br /> Ross states sewer pipe on PVC pipe cannot <br /> be mechanical joints must be approved pipe <br /> for inside foot print of new building. <br /> Please contact Steve Miller on new roof <br /> drains. <br /> 5/15/2015 5/15/2015 PlbgGrWork DXW PartialApproval See notes 6"drain pipe 30 feetof 6"in footprint of <br /> building.This piece of pipe runs east to <br /> west--call for inspection for groundwork <br /> connection from ross to this 6". Ross pipe <br /> will run south to north about 10'. <br /> Call for public works inspection on outside <br /> of building sewer hook up <br /> 5/18/2015 5/18/2015 PlbgGrWork SDP Approval sewer tie-in inside <br /> bldg,ok to cover <br /> 718/20_ 7/8/2015 Mark Final" DXW Approva <br /> 7/8/2015 7/8/2015 Final Plbg DXW Approval Shell only,see notes Final Plumbing OK for shell only. Futur <br /> TI work for any other plumbing requir <br /> new permit <br /> 74 �S <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.