Laserfiche WebLink
INSPECTION REPORT <br /> Date: 2- 2 Permit:—F\1F) <br /> @477- 1 <br /> Contractor: "' <br /> Owner: f <br /> Site Address' <br /> 1 YPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> H-Temp Service ❑LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Gr unding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Drywall Nailing ❑ Plumbing Final <br /> al ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> '❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL PPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ECT N REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOL <br /> E] UNABLE TO PERF CTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> FL&YL <br /> Inspector: Date: <br /> EIR(4/09) /�NaT_RE 1*PIROM10111111ONS 415/488-8900 <br />