Laserfiche WebLink
INSPECTION REPORT <br /> Date: 0 (J Permit: ` LO O <br /> (4Z-7T <br /> Contractor: K-ra 55/h fG t ec" <br /> Own'e`r: /�' <br /> Site ddress: [� �'I (!�, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Tough In ❑Structural Slab El OK to insulate ❑OK to insulate <br /> ervice ❑Framing ❑ Rooftop Units El Water Service <br /> Grounding ❑Insulation 1-1 Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH R OR CONSULTATION: <br /> 01 1 <br /> AIJPROVAIL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE T <br /> FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> i�isNecto�. Date: its <br /> FIR /�jAT X�FOR S&PROMO ONS•42./488-8900 <br />