Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: l 7 <br /> Contractor: <br /> Owner: <br /> Site Address: Z 2 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK E]Roof Nailing ❑Rough In/Service Hot Water Tank <br /> Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE MIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> F-1UNABLETO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> x Ir- <br /> r) <br /> Inspector: Date: l l <br /> EIR(4/09) , ,noNs•azs�aaa-nvoo <br />