Laserfiche WebLink
(ESTIMATE OF TASK LABOR I Job No.: 2513 <br /> Job Name: Union Slough Levee Restoration Date: 7/22/2016 Prepared by: mrm/wno Exhibit B-Page 2 of 2 <br /> Senior Senior Estimated <br /> Associate Associate Associate Project Total Labor <br /> Senior Drafter Secretary CCI Labor Cost Direct Subcontractors Task Total <br /> Task Description Engineer Geologist Engineer Engineer Hours Expenses <br /> Task 1 Project Management and Coordination <br /> 1.1 Monthly Project Status Report and Invoices - 20 20 $ 3,232.20 $ 523.50 $ - $ 3,755.70 <br /> 1.2 Protect Coordination 18 20 2 6 46 $ 8,099.48 $ - $ - $ 8,099.48 <br /> Task 2 Topographic Survey and Base Map Preparation <br /> 2.1 Supplemental Topographic Survey and Base Map Preparation 2 4 6 $ 644.90 $ - $ - $ 644.90 <br /> Task 3 Geotechnical Investigation and Design Recommendations <br /> 3.1 Report,Mapping and Data Review 1 8 8 17 $ 2,586.66 $ - $ - $ 2,586.66 <br /> 3.2 Site Reconnaissance 20 20 $ 3,232.20 $ 523.50 $ - $ 3,755.70 <br /> 3.3 Phase 1 Subsurface Investigation 6 90 96 $ 12,896.46 $ 1,573.20 $ 21,400.00 $ 35,869.66 <br /> 3.4 Phase 1 Laboratory Testing 3 31 34 $ 4,592.95 $ - $ 4,592.95 <br /> 3.5 Geotechnical Analyses 26 12 120 106 38 16 318 $ 46,258.00 $ - $ - $ 46,258.00 <br /> Task 5 Design Development and Alternatives Evaluation 4 32 26 2 64 $ 9,625.64 $ - $ 9,625.64 <br /> Direct Labor(hrs): 45 16 231 263 42 24 621 <br /> Rate per hour($): $ 233.62 $ 219.06 $ 161.61 $ 132.52 $ 80.42 $ 66.18 <br /> Labor Cost by Discipline: $ 10,512.90 $ 3,504.96 $ 37,331.91 $ 34,852.76 $ 3,377.64 $ 1,588.32 $ 91,168.49 $ 91,168.49 $ 2,620.20 $ 21,400.00 $115,188.69 <br />