My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9300 W MALL DR 2016-08-24
>
Address Records
>
W MALL DR
>
9300
>
9300 W MALL DR 2016-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:44:33 AM
Creation date
8/24/2016 2:34:40 PM
Metadata
Fields
Template:
Address Document
Street Name
W MALL DR
Street Number
9300
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EV ETT <br />(425) 257-8810 <br />Plan Check No.: <br />Application Date: <br />Tenant: <br />Owner: <br />Job Address: <br />Proposed Use: <br />� <br />B1507-033 (BLDG A) <br />B1507-034 (BLDG B) <br />B1507-035 (BLDG C) <br />7/20/2015 <br />WEST MALL PLACE APARTMENTS <br />WEST MALL PLACE APTS LLC <br />9300 W MALL DR <br />APARTMENTS <br />Description of Work: SIDING REPLMENT, PRIVATE DECK <br />REPAIRS, WINDOW/DOOR ROUGH <br />OPENING FLASHING. WINDOWS/DOORS TO <br />BE REINSTALLED OR REPLACED IN <br />NECESSARY. <br />Plan Check Fee Paid: $2167.14 �� ZZ� �i� (� X 3) <br />The building permit application for the above-referenced project is being conditionally accepted for filing <br />pending the determination of its completeness. <br />If'the City review d�termines that any additional land use approval or any additional information is <br />required to complete your building permit application, it will be necessary to submit this additional <br />information or acq�iire the additional land use approval prior to your application being considered complete <br />for tilin�. Ifno other land use approval or additional information is required, your building permit <br />application will be coilsidered tiled as of this date. Plan review fees are estimates. Final plan review fees <br />will be calculated at penmit issuance. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />� V��.� I ✓% <br />Signature <br />� �� ' s <br />Date <br />FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.