My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1005 PACIFIC AVE 2018-01-30
>
Address Records
>
PACIFIC AVE
>
1005
>
1005 PACIFIC AVE 2018-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 2:06:43 PM
Creation date
8/25/2016 1:21:32 PM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1005
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />�;,., <br />"; E4 ETT <br />(425) 257-8810 <br />Plan Check No.: <br />Application Date: <br />Tenant: <br />Owner: <br />Job Address: <br />Proposed Use: <br />� <br />B 1605-025 <br />5/12/2016 <br />I1�Lel��Y�1�1►1�1:�1�1�1�'Ly��i�:7 <br />PUGET SOUND KIDNEY CENTER <br />1005 PACIFIC AVE <br />COMMERCIAL <br />Description of Work: TEMP STAIR ENCLOSURE-PUGET SOUND <br />- KIDNEY CENTER <br />i �'=� <br />`�� Plan Check Fee Paid: $136.01 <br />��. <br />�=� ,::.._ <br />� :� <br />_LL-- _�_ ,. _� i"��:5 <br />r- <br />t-: <br />:G_ - <br />�-"�;he building permit application for the above-referenced project is being conditionally accepted far filing <br />`pending the determination of its completeness. <br />If the City review determines that any additional land use approval or any additional information is <br />required to complete your building permit application, it will be necessary to submit this additional <br />information or acquire the additional land use approval prior to your application being considered complete <br />for filing. If no other land use approval or additional information is required, your building permit <br />application will be considered filed as ofthis date. Plan review fees are estimates. Final plan review fees <br />will be calculated at permit issuance. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />, �_�.��1� <br />Signature Date <br />i <br />FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.