Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for the Grand 8/3/2016 Briefing COUNCIL BILL# <br /> Avenue Park Bridge Proposed Action Originating Department Public Works <br /> Construction Consent Contact Person Heather Griffin <br /> 8/10/2016 Action Phone Number 425-257-7206 <br /> First Reading FOR AGENDA OF August 3, 2016 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA a\4. <br /> Council President !A 111 <br /> Location Preceding Action Attachments Department(s)Approval <br /> 16th Street& Grand Ave 12/3/2014 Consultant Public Works <br /> Agreement for Design <br /> Amount Budgeted $14,800,000 <br /> Expenditure Required $1,000 Account Number(s): 401 and PW3588 <br /> Budget Remaining $13,000,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Grand Avenue Park Bridge design provides for a utility and pedestrian crossing from Grand Avenue <br /> Park,over a steep slope,Burlington Northern Santa Fe Railroad tracks, State Route 529 (also known as West <br /> Marine View Drive)to the waterfront. <br /> The project has two phases: the first phase is construction of the utility and pedestrian bridge near 16th Street <br /> between Port of Everett property along West Marine View Drive and Grand Avenue Park. The second phase <br /> consists of building the utility pipelines from 50 feet north of the constructed bridge to the existing outfall <br /> locations near 14th and 15th Streets. <br /> The current Engineer's Construction Estimate for Phase 1 is $11 million and for Phase 2 is $1.3 million. <br /> RECOMMENDATION: <br /> Authorize the Call for Bids for Phase 1 and 2 of the Grand Avenue Park Bridge construction. <br /> 1 <br />