Laserfiche WebLink
I <br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> 1. A complete and accurate description of the event or events giving rise to the Notice, including <br /> dates,times,and locations; <br /> 2. A preliminary list of persons of involved in such event; <br /> 3. A statement whether the Contractor believes the event may result in a Contract Claim for <br /> additional Contract Time or adjustment of the Contract Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br /> section. <br /> 10.3 SUPPLEMENTAL INFORMATION <br /> Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br /> following: <br /> 1. The date of the event,incident,direction,and other pertinent information; <br /> 2. The nature and circumstances giving rise to the Notice; <br /> 3. The Contract provisions relating to,but not limited to,the event, incident,and direction; <br /> 4. The estimated dollar cost, if any,of the Extra Work,or Delay, or both and how that estimate was <br /> determined;and <br /> 5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br /> asserting a schedule change or disruption. <br /> Throughout any work related to a Notice,the Contractor shall keep complete and accurate records of <br /> costs,expenses,and time incurred for which Contractor will or may seek an adjustment. Contractor <br /> waives and is stopped from seeking an adjustment of Contract Sum or Contract Time where Contractor <br /> fails to keep and maintain cost,timekeeping, and scheduling records segregated and contemporaneously <br /> allocated to the subject work for which an adjustment is sought. For example,failure to keep <br /> contemporaneous labor and equipment time records specifically and only allocated to each item of <br /> claimed Extra Work shall constitute a waiver of any Contract Claim for reimbursement or additional <br /> Contract Time for each such item of Extra Work. The Contractor shall permit the Owner access to these <br /> and any other records needed for evaluating requests for additional Contract Time or Contract Sum. <br /> 1 11. DIFFERING SITE CONDITIONS <br /> Upon discovery and before such conditions are disturbed, the Contractor shall promptly provide Notice to <br /> the Owner's Representative of: <br /> 1. Preexisting subsurface or latent physical conditions at the Site differing materially from those <br /> indicated in this Contract,or <br /> 2. Preexisting unknown physical conditions at the Site, of an unusual nature, differing materially <br /> from those ordinarily encountered and generally recognized as inhering in Work of the character <br /> provided for in this Contract. <br /> The Owner's Representative will promptly investigate the conditions. If the Owner's Representative <br /> finds that conditions are materially different and cause a material increase or decrease in the Contractor's <br /> cost of performance of the Work, or extends the duration of the critical path of the schedule,the Owner's <br /> Representative will make an adjustment of Contract Sum or Contract Time. Extensions of Contract Time <br /> will be evaluated in accordance with 5.2.2.2 Extensions of Contract Time. <br /> However,if the parties are unable to agree on an adjustment of Contract Sum or Contract Time, the <br /> Owner's Representative will determine the amount of the adjustment of Contract Sum or Contract Time. <br /> If the Owner's Representative determines that differing Site conditions do not exist or that no adjustment <br /> in Contract Sum or Contract Time is warranted, such determination shall be final. If there is a decrease in <br /> GENERAL CONDITIONS 00 7200-41 <br /> I <br />