Laserfiche WebLink
1 <br /> CITY OF EVERETT—PROJECT NAME DATE <br /> Project: i <br /> Change Order No.: <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for the changes I <br /> described in Exhibit A,represents complete compensation for the changes described in Exhibit A, <br /> including all direct and indirect costs and impacts.The contract price shall be adjusted as described in <br /> this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or his designee <br /> is authorized to direct Contractor to perform additional work.In calculating such threshold amounts, <br /> Washington State sales tax,if applicable to the Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this Change Order,the <br /> work described in Exhibit A,and all work and actual or constructive changes that occurred or began <br /> prior to the date of this Change Order,including,but not limited to,claims for equitable adjustment of <br /> time and compensation,delay,impact,overhead,or inefficiencies. This provision does not apply to <br /> requests for equitable adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a differing site condition, <br /> protest,dispute,claim,or Contract Claim that ends after the date of this Change Order,but relates to <br /> work performed prior to the date of this Change Order,then this provision does not apply if the <br /> Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent explicitly <br /> provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney I <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Manager Project Engineer (if Engineering Manager(if Department Director <br /> (if applicable) applicable) applicable) <br /> I <br /> Date: Date: <br /> Date: Date: I <br /> 1 <br /> CONTRACT MODIFICATION PROCEDURES 00 2600 -4 <br /> I <br />