Laserfiche WebLink
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I5. Protect the rights of abutting property owners by: <br /> a. Planning and conducting construction operations so that the least <br /> I b. inconvenience as possible is caused to abutting property owners; <br /> Except during those urgent stages of construction when it is impractical <br /> to carry on the construction and maintain traffic simultaneously, <br /> I maintaining ready and convenient access to driveways,houses, and <br /> buildings along the line of Work; <br /> c. The Contractor shall post signs and barricades advising Street closure at <br /> the nearest intersections away from the closed portion of the Street and <br /> I on all cross-Streets. Street closings shall not exceed 2 blocks in length at <br /> any one time unless approved otherwise by the Owner. <br /> d. When Street closure is required in the preparation of the Roadway for <br /> I placement of asphalt pavement,concrete pavement, sewer excavation, or <br /> other construction that prohibits safe vehicular traffic,abutting property <br /> owners and tenants shall be notified 10 days in advance of any <br /> I e. restrictions that might affect access to their property. <br /> Providing temporary approaches to crossing or intersecting roads and <br /> keeping those approaches in good condition;and <br /> f. Providing another access before closing an existing one whenever the <br /> Contract calls for removing and replacing an abutting owner's access. <br /> The existing access shall not be closed until the replacement access <br /> facility is available; and <br /> I g. Access to Private Properties <br /> 1) The Contractor shall maintain access for local vehicular and <br /> pedestrian traffic to private properties along the line of Work <br /> I except: <br /> a) During those urgent stages of construction when it is <br /> impractical to carry on the construction and maintain vehicular <br /> I and pedestrian traffic simultaneously, or <br /> b) When Street closure is required because construction will <br /> prohibit safe vehicular traffic. <br /> I 2) If a Street or alley is to be closed,the Contractor shall notify all <br /> abutting property owners and tenants of the closures or of any other <br /> restrictions that may interfere with their access. <br /> 3) Notification shall be at least 2 days in advance for residential <br /> I property,and at least 5 days s in advance for commercial property. <br /> 6. When traffic must pass through grading areas,the Contractor shall: <br /> a. Make cuts and fills that provide a smooth, even Roadbed; <br /> I b. Place,in advance of other grading work, enough fill at all Culverts and <br /> bridges to permit traffic to cross; <br /> c. Make Roadway cuts and fills, if ordered by the Owner,in partial-width <br /> I lifts,alternating lifts from side to side to permit traffic to pass on the side <br /> opposite the Work; <br /> d. Install Culverts on half the width of the Traveled Way,keeping the other <br /> half open to traffic and unobstructed until the first half is ready for use; <br /> I 7. After rough grading or placing any subsequent layers: <br /> a. Prepare the final Roadbed to a smooth, even surface(free of humps and <br /> dips) suitable for use by public traffic; and <br /> Ib. Settle dust with water,or other dust palliative, as the Owner may order. <br /> IVEHICULAR ACCESS AND PARKING 01 5500-3 <br /> I <br />