My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> e. Speed and Parking Control: <br /> 1) In those areas where construction operations have changed Road <br /> conditions, such additional hazards as reduced lane width,open <br /> trenches, temporary Roadway, etc.,may be considered as evidence <br /> of need for an alteration of the legal(or posted)speed limit. <br /> Requests for alteration of the legal speed limits on City Streets must <br /> be submitted to the Traffic Engineer. Costs related to speed limit <br /> revisions and parking control shall be borne by the Contractor and at <br /> no additional cost to the Owner. • <br /> 5. Construction and Maintenance of Detours: <br /> a. Unless otherwise approved,the Contractor shall maintain two-way traffic <br /> during construction. The Contractor shall build,maintain in a safe <br /> condition,keep open to traffic,and remove when no longer needed: <br /> 1) Detours and detour bridges that will accommodate traffic diverted <br /> from the Roadway or bridge during construction <br /> 2) Detour crossings of intersecting Streets <br /> 3) Temporary approaches <br /> b. All on-site or off-site detours required or necessitated by the Work, <br /> including side Street crossings,temporary bridges over freshly placed <br /> concrete,utilization of one or more lanes of the construction area for <br /> maintenance of through traffic,and related traffic control shall be the <br /> responsibility of the Contractor. <br /> c. Any detour proposed by the Contractor shall not be built until the Owner <br /> approves. Surfacing and paving shall be consistent with traffic <br /> requirements. <br /> D. Measurement <br /> 1. Measurement for"Maintenance and Protection of Traffic Control" shall be part <br /> of the Lump Sum Base Bid price. <br /> E. Payment <br /> 1. Compensation for the costs necessary to complete the work described in this <br /> Section will be made as part of the Lump Sum Base Bid price to include the <br /> following: <br /> a. Maintenance and Protection of Traffic Control <br /> b. Traffic Control Labor, <br /> c. Construction Signs Class A, <br /> d. Construction Signs Class B. <br /> PART 2 -PRODUCTS I <br /> NOT USED <br /> PART 3—EXECUTION I <br /> NOT USED <br /> END OF SECTION <br /> VEHICULAR ACCESS AND PARKING 01 5500 - 14 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.