Laserfiche WebLink
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> e. Speed and Parking Control: <br /> 1) In those areas where construction operations have changed Road <br /> conditions, such additional hazards as reduced lane width,open <br /> trenches, temporary Roadway, etc.,may be considered as evidence <br /> of need for an alteration of the legal(or posted)speed limit. <br /> Requests for alteration of the legal speed limits on City Streets must <br /> be submitted to the Traffic Engineer. Costs related to speed limit <br /> revisions and parking control shall be borne by the Contractor and at <br /> no additional cost to the Owner. • <br /> 5. Construction and Maintenance of Detours: <br /> a. Unless otherwise approved,the Contractor shall maintain two-way traffic <br /> during construction. The Contractor shall build,maintain in a safe <br /> condition,keep open to traffic,and remove when no longer needed: <br /> 1) Detours and detour bridges that will accommodate traffic diverted <br /> from the Roadway or bridge during construction <br /> 2) Detour crossings of intersecting Streets <br /> 3) Temporary approaches <br /> b. All on-site or off-site detours required or necessitated by the Work, <br /> including side Street crossings,temporary bridges over freshly placed <br /> concrete,utilization of one or more lanes of the construction area for <br /> maintenance of through traffic,and related traffic control shall be the <br /> responsibility of the Contractor. <br /> c. Any detour proposed by the Contractor shall not be built until the Owner <br /> approves. Surfacing and paving shall be consistent with traffic <br /> requirements. <br /> D. Measurement <br /> 1. Measurement for"Maintenance and Protection of Traffic Control" shall be part <br /> of the Lump Sum Base Bid price. <br /> E. Payment <br /> 1. Compensation for the costs necessary to complete the work described in this <br /> Section will be made as part of the Lump Sum Base Bid price to include the <br /> following: <br /> a. Maintenance and Protection of Traffic Control <br /> b. Traffic Control Labor, <br /> c. Construction Signs Class A, <br /> d. Construction Signs Class B. <br /> PART 2 -PRODUCTS I <br /> NOT USED <br /> PART 3—EXECUTION I <br /> NOT USED <br /> END OF SECTION <br /> VEHICULAR ACCESS AND PARKING 01 5500 - 14 <br /> 1 <br />