My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> C. Space Requirements: Verify space requirements and dimensions of items shown <br /> diagrammatically on Drawings. <br /> D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br /> clarification of the Contract Documents caused by differing field conditions outside the control <br /> of Contractor, submit a request for information to Architect according to requirements in <br /> Section 013113 "Project Coordination." <br /> 3.3 INSTALLATION <br /> A. General: Locate the Work and components of the Work accurately, in correct alignment and <br /> elevation, as indicated. <br /> 1. Make vertical work plumb and make horizontal work level. <br /> 2. Where space is limited, install components to maximize space available for maintenance <br /> and ease of removal for replacement. <br /> 3. Conceal pipes,ducts, and wiring in finished areas unless otherwise indicated. <br /> B. Comply with manufacturer's written instructions and recommendations for installing products in <br /> applications indicated. <br /> C. Install products at the time and under conditions that will ensure the best possible results. <br /> Maintain conditions required for product performance until Substantial Completion. <br /> l D. Conduct construction operations so no part of the Work is subjected to damaging operations or <br /> loading in excess of that expected during normal conditions of occupancy. <br /> ' E. Sequence the Work and allow adequate clearances to accommodate movement of construction <br /> items on site and placement in permanent locations. <br /> F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. <br /> G. Templates: Obtain and distribute to the parties involved templates for work specified to be <br /> factory prepared and field installed. Check Shop Drawings of other work to confirm that <br /> ' adequate provisions are made for locating and installing products to comply with indicated <br /> requirements. <br /> H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size <br /> and number to securely anchor each component in place, accurately located and aligned with <br /> other portions of the Work. Where size and type of attachments are not indicated, verify size <br /> and type required for load conditions. <br /> 1. Mounting Heights: Where mounting heights are not indicated, mount components at <br /> heights directed by Architect. <br /> ' 2. Allow for building movement,including thermal expansion and contraction. <br /> 3. Coordinate installation of anchorages. Furnish setting drawings,templates, and directions <br /> for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with <br /> integral anchors, that are to be embedded in concrete or masonry. Deliver such items to <br /> Project site in time for installation. <br /> I <br /> EXECUTION 01 7300-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.