My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> H. Patching: Patch construction by filling,repairing,refinishing, closing up, and similar operations <br /> following performance of other work. Patch with durable seams that are as invisible as <br /> practicable. Provide materials and comply with installation requirements specified in other <br /> Sections,where applicable. <br /> 1. Inspection: Where feasible, test and inspect patched areas after completion to <br /> demonstrate physical integrity of installation. <br /> 2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration <br /> into retained adjoining construction in a manner that will minimize evidence of patching <br /> and refinishing. <br /> a. Clean piping, conduit, and similar features before applying paint or other finishing <br /> materials. <br /> b. Restore damaged pipe covering to its original condition. <br /> 3. Floors and Walls: Where walls or partitions that are removed extend one finished area <br /> into another, patch and repair floor and wall surfaces in the new space. Provide an even <br /> surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall <br /> coverings and replace with new materials, if necessary, to achieve uniform color and <br /> appearance. <br /> a. Where patching occurs in a painted surface,prepare substrate and apply primer and <br /> intermediate paint coats appropriate for substrate over the patch, and apply final <br /> paint coat over entire unbroken surface containing the patch. Provide additional <br /> coats until patch blends with adjacent surfaces. <br /> 4. Ceilings: Patch, repair, or rehang in-place ceilings as necessaryto provide aneven-plane <br /> surface of uniform appearance. <br /> 5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a <br /> weather tight condition and ensures thermal and moisture integrity of building enclosure. <br /> I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, <br /> mortar,oils,putty,and similar materials from adjacent finished surfaces. <br /> ' 3.5 OWNER-INSTALLED PRODUCTS <br /> A. Site Access: Provide access to Project site for Owner's construction personnel. <br /> B. Coordination: Coordinate construction and operations of the Work with work performed by <br /> Owner's construction personnel. <br /> 1. Construction Schedule: Inform Owner of Contractor's preferred construction schedule for <br /> Owner's portion of the Work.Adjust construction schedule based on a mutually agreeable <br /> timetable. Notify Owner if changes to schedule are required due to differences in actual <br /> construction progress. <br /> 2. Preinstallation Conferences: Include Owner's construction personnel at preinstallation <br /> conferences covering portions of the Work that are to receive Owner's work. Attend <br /> preinstallation conferences conducted by Owner's construction personnel if portions of <br /> the Work depend on Owner's construction. <br /> i <br /> EXECUTION 01 7300-7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.