My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> 3. Division 26—Electrical: (If applicable to these Contract Documents) <br /> Bind all product data,product maintenance data,and warranty information on <br /> together for each product listed.All products that could require replacement during <br /> the 40-year life of this project must be covered in this manual. <br /> a. Product Data-submit original product literature only.Mark each sheet to r <br /> clearly identify specific products and component parts and data applicable to <br /> installation.Modify product data as required to accurately represent completed <br /> installation. Delete inapplicable information. 111 <br /> b. Include electrical control diagrams,description of system and component parts, <br /> circuit directories of panel boards,as-installed color coded wiring diagrams, <br /> operating procedures,maintenance procedures,manufacturer's printed , <br /> operating and maintenance instructions,listed under pertinent Specifications <br /> Sections. This section shall also include lighting fixtures with all data. <br /> c. Prepare and include additional data when the need for such data becomes <br /> apparent during instruction of Engineer's personnel. <br /> G. Warranties and Bonds: <br /> 1. Bind in copy of each warranty with each product or system. One original of each <br /> warranty shall be bound in a separate labeled hard cover binder and submitted with <br /> the Approved 0&M Manuals. See section 017836 Warranties and Bonds. <br /> 1.06 SUBMITTAL SCHEDULE <br /> A. Submit one copy of preliminary draft of proposed formats and outlines of contents to the <br /> Owner for review and approval.After review,the copy will be returned to the contractor <br /> with accompanying comments. <br /> B. Submit one copy of completed data in approved fmal form to the Owner for final review. <br /> This copy will be required prior to Contractor training of Parks'personnel <br /> C. Submit three(3)copies of approved Manuals in final form prior to Substantial Completion. <br /> PART 2-PRODUCTS <br /> NOT USED I <br /> PART 3-EXECUTION <br /> NOT USED <br /> END OF SECTION <br /> I <br /> OPERATIONS AND MAINTENANCE DATA 01 7823 -4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.