My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> U <br /> SUBSTITUTION REQUEST FORM <br /> PROJECT: REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for above project: <br /> SECTION: <br /> SPECIFIED ITEM: <br /> PROPOSED SUBSTITUTION: <br /> Attach complete technical data,including laboratory tests,and samples,as applicable. <br /> Attach detailed comparison of the significant qualities(size,weight,durability,performance and similar <br /> characteristics, and including visual effect where applicable) for the proposed substitution in comparison <br /> with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required by proposal. <br /> ' Fill in Blanks Below: <br /> A. Does substitution require change in drawing dimensions? <br /> 1 B. Will Undersigned pay for resulting building design changes including engineering and detailing <br /> costs? <br /> 1 C. What effect does substitution have on other trades? <br /> D. Differences betweenro osed substitution and specified item? <br /> p p P <br /> E. Manufacturer's guarantees of proposed and specified items are: Same Different <br /> tDescribe difference <br /> F. Name and address of three(3)similar projects on which the product was used,and date of <br /> installation. <br /> G. Contract completion date is: Same Different <br /> Describe difference <br /> SUBSTITUTION REQUEST FORM 00 6325 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.