Laserfiche WebLink
I <br /> IPOLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> 8.5. Requests for Substitution 26 <br /> I 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> 8.6.1. Inspection 26 <br /> 8.6.2. Samples of Materials 27 <br /> I 8.6.3. Certification 27 <br /> 8.6.4. Inspection at Point of Manufacturing 27 <br /> 8.6.5. Testing and Commissioning of Completed Work 27 <br /> I 8.6.6. Storage of Materials and Equipment 27 <br /> 8.6.7. Manufacturer's Directions 27 <br /> 8.7. Defective Work 27 <br /> I 8.7.1. Correction of Defective Work 27 <br /> 8.7.2. Retention of Defective Work 28 <br /> 8.8. Materials and Equipment Furnished by Owner 28 <br /> I 8.9. Guarantee 28 <br /> 8.10. Correction Period 29 <br /> I 9. MEASUREMENT AND PAYMENT 30 <br /> 9.1. Payments to Contractor 30 <br /> 9.1.1. Schedule of Values 30 <br /> I 9.1.2. Progress Payments 30 <br /> 9.1.2.1 Payment Request Procedures: 30 <br /> 9.1.2.2 Review Procedures: 30 <br /> I 9.1.2.3 Retained Percentage 31 <br /> 9.1.2.4 Withholding 31 <br /> 9.1.3. Final Payment 31 <br /> 1 9.2. Payment for Changes 32 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 32 <br /> 9.2.1.1. Increased Quantities 32 <br /> I <br /> 9.2.1.2. Decreased Quantities 32 <br /> 9.2.1.3. Limitations 33 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 33 <br /> I <br /> 9.2.3. Deleted Work 33 <br /> 9.3. Charges to Contractor 34 <br /> I 9.4. Compensation to Owner for Time Extension 34 <br /> 9.5. Adjustment of Contract Sum 34 <br /> 9.5.1 Calculation 34 <br /> I <br /> 9.5.2 Limitations 35 <br /> 9.5.3 Unabsorbed and Extended Overhead 35 <br /> 9.6. Force Account 36 <br /> I 9.6.1 Labor . 36 <br /> 9.6.2. Materials. 37 <br /> 9.6.3. Equipment 37 <br /> I 9.6.4. For Services. 38 <br /> 9.6.5. For Mobilization. 38 <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. 38 <br /> I9.7. Retainage 39 <br /> GENERAL CONDITIONS 00 7200 -iii <br />