Laserfiche WebLink
' POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> The following costs and expenses are excluded from the definition and calculation of Overhead. <br /> Overhead costs that vary substantially with the volume of Work performed(as measured by billings)shall <br /> not be included in Overhead for the purpose of determining additional compensation for Extended or <br /> Unabsorbed Home Office Overhead or both. <br /> Examples of costs that are not included in Overhead include,but are not limited to,travel and business <br /> meetings,telephones,professional fees expended for the benefit of a specific project,union welfare <br /> benefits,payroll taxes and equipment rental. <br /> ' If related party transactions are included in a Contractor's Overhead,they shall be explicitly identified as <br /> related party transactions and shall not exceed amounts that would be incurred in an arms-length <br /> transaction for the provision of the same or similar goods and services. If such transactions exist and the <br /> ' amounts paid by the Contractor and included in Overhead are in excess of that which would normally be <br /> expended in an arms-length transaction,an adjustment,in the form of a reduction in the amount for <br /> calculation purposes,shall be included in any calculation in determining the amount of Allocable <br /> Overhead. <br /> ' Overhead shall not include any cost directly attributable to a particular project. If a cost can be traced to a <br /> particular Contract,the Contractor may not classify the cost as Overhead. <br /> ' Indirect or home office costs that vary substantially with the amount of Work performed shall not be <br /> included in the group of costs comprising Overhead. <br /> Overhead shall not include costs specifically disallowed by Federal Acquisition Regulations, Subpart 31.2 <br /> —Contracts with Commercial Organizations,or its successor. Further,"Overhead"shall not include the <br /> costs of"field support services"that are more closely direct costs in nature,regardless of the manner in <br /> which the Contractor normally accounts for such costs. An example of such disallowed cost would be for <br /> ' material handling and expediting,which are costs incurred for the direct support and benefit of specific <br /> project(s). <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of specific costs <br /> not allowed in a calculation under this section of the Contract include,but are not limited to, Incentive <br /> Compensation paid to personnel classified as Overhead and otherwise includable under this section of <br /> Contract,travel and business meetings,employer paid benefits and taxes on direct payroll costs of any <br /> project, insurance costs directly identifiable to a specific project,penalties,and costs incurred regarding <br /> company owned equipment normally classified as a direct project costs. <br /> Owner: The City of Everett,Washington. "Owner" and the"City"mean the same. <br /> ' Owner's Representative: The person designated in writing and employed or retained by the Owner to <br /> act as its representative at the construction Site and to perform construction inspection service and <br /> administrative functions relating to this Contract. The terms"Owner's Representative", "Engineer"and <br /> "Architect"are interchangeable. <br /> Person: Includes individuals,associations,firms,companies,corporations,partnerships, and joint <br /> ventures. <br /> ' Physical Completion: Physical Completion Date is the day all of the Work is physically completed on <br /> the Project. All documentation required by the Contract and required by law does not necessarily need to <br /> be furnished by the Contractor by this date. <br /> ' Progress Schedule:A schedule prepared and maintained by Contractor,describing the sequence and <br /> duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract <br /> Time. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> GENERAL CONDITIONS 00 7200- 3 <br />