My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15. 2016 <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> ' recommended by the Owner's Representative. The Owner has the authority to make determinations of <br /> the acceptability of the Work. The Owner also has the authority to accept or reject the Owner's <br /> Representative's recommendations regarding retention of defective Work. <br /> 3.2. OWNER'S REPRESENTATIVE <br /> The Owner's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract.The Contract and Specifications give the Owner's Representative authority <br /> over the administration of the Contract. Whenever it is so provided in this Contract,the decision of the <br /> Owner's Representative shall be final. <br /> The Owner's Representative's decisions will be fmal on all questions including but not limited to,unless <br /> ' specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> ' 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> 7. Suspension(s)of Work. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> ' 1. The Owner's Representative may use the Owner's resources, other contractors,or other means to <br /> accomplish the Work,and <br /> 2. The Owner will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> payments, any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders,or <br /> to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. <br /> The Owner's Representative and Owner shall have complete access to the Work and to the Site of the <br /> ' Work and to the places where Work is being prepared or where materials,Equipment,and machinery are <br /> being obtained for the Work. If requested by the Owner's Representative or Owner,the Contractor shall <br /> provide the assistance necessary for obtaining such access, and shall provide information related to the <br /> inspection of construction. Absence of such access or information,as needed,may result in the Owner's <br /> refusal to accept the Work. <br /> The Owner's Representative has the authority to recommend Change Orders,but does not have authority <br /> to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br /> ' No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br /> the Owner unless and until the Mayor or his or her designee signs it,as authorized by City Council or by <br /> ordinance. <br /> ' To detail and illustrate the Work,the Owner's Representative may furnish to the Contractor additional <br /> Drawings and explanations consistent with the original Drawings. The Contractor shall perform the Work <br /> according to these additional Drawings and explanations. <br /> ' GENERAL CONDITIONS 00 7200-9 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.