My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> 5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320,not have been found out of compliance by the Washington state apprenticeship <br /> and training council for working apprentices out of ratio,without appropriate supervision,or <br /> outside their approved work processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br /> solicitation;and I <br /> 6. Until December 31,2013,not have violated RCW 39.04.370 more than one time as determined <br /> by the department of labor and industries. <br /> The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br /> with the Owner. Contractor shall,include the provisions of these Contract Documents or a"flow down" <br /> clause in each contract with Subcontractors and Suppliers. <br /> 111 <br /> 4.4. RESPONSIBILITIES <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers ' <br /> The Contractor shall be responsible for the adequacy,efficiency and sufficiency of Subcontractors, <br /> manufacturers, Suppliers and their employees. <br /> 4.4.2. Contractor's Employees <br /> The Contractor shall be responsible for the adequacy,efficiency and sufficiency of its employees. <br /> Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br /> them. <br /> 4.4.3. Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including 1 <br /> Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br /> wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br /> to pay any and all accounts for services,Equipment,and materials used by him and its Subcontractors <br /> during the performance of Work under this Contract. The Contractor shall pay such accounts as they 111 <br /> become due and payable. If requested by the Owner,the Contractor shall promptly furnish proof of <br /> payment of such accounts to the Owner. <br /> 4.4.4. Attention to Work <br /> The Contractor, acting through its representative,shall give personal attention to and shall manage the <br /> Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br /> representative is not personally present at the Project Site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> 4.4.5. Safety <br /> The Contractor alone shall be responsible for safety on the job Site, including,but not limited to,the <br /> safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br /> perform the Work in a manner which meets the Owner's responsibility under statutory and common law <br /> for the provision of a safe place to work. <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors,its Subcontractors' employees, or any other <br /> agents to threaten bodily injury or property damage, to intimidate or attempt to intimidate any person,or • <br /> to assault or physically harass any person. Forbidden conduct includes,but is not limited to,threatening, <br /> appearing,or actually doing any of the following: pushing, shoving,striking,physically blocking a person <br /> or a person's vehicle,vandalism, malicious mischief,or any other act that a reasonable person would <br /> understand be intended to intimidate,cause personal injury,or cause property damage. Contractor shall <br /> GENERAL CONDITIONS 00 7200- 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.