My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> cause of the action taken by Contractor in response to such an emergency,a Work Change Directive or <br /> Change Order will be issued. <br /> 4.4.12. Trench Excavation <br /> For all trench excavations that exceed a depth of four feet,the Contractor must use adequate safety <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act, chapter 49.17 <br /> RCW. <br /> 4.5. OWNER-CONTRACTOR COORDINATION <br /> 4.5.1. Service of Notice <br /> Contractor agrees that any Notice,order,direction, request or other communication by the Owner's <br /> Representative or Owner to the Contractor shall be deemed received by the Contractor if left at any office <br /> used by the Contractor or delivered to any of the Contractor's officers,clerks or employees or posted at <br /> the site of the Work or mailed to any post office addressed to the Contractor at the address given in the <br /> Contract Documents or mailed to the Contractor's last known place of business. If mailed,any form of <br /> communication will be deemed to have been given to and received by the Contractor the day after the day <br /> of mailing. <br /> 4.5.2. Suggestions to Contractor <br /> Nothing in these Contract Documents requires the Owner's Representative to provide the Contractor with <br /> direction or advice on how to do the Work, construction practices, or means and methods. If the Owner's <br /> Representative approves, suggests or recommends any construction practice,means,method or manner <br /> for doing the Work or producing materials,the approval or recommendation shall not: (A)guarantee that <br /> following the method or manner will result in compliance with the Contract Documents; (B)relieve the <br /> Contractor of any risks or obligations under the Contract Documents;or(C) create any liability by the <br /> Owner to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the 1 <br /> Owner or the Owner's Representative to the Contractor but not specified or required,if adopted or <br /> followed by the Contractor in whole or in part,shall be used at the risk and responsibility of the <br /> Contractor. The Owner and the Owner's Representative assume no responsibility therefor and in no way <br /> will be held liable for any defects in the Work which may result from or be caused by use of such plan or <br /> method or Work. <br /> 4.5.3 Meetings with Owner I <br /> The Contractor shall have its duly authorized representative attend periodic informational meetings with <br /> the Owner's Representative and City staff,as reasonably required by the Owner. <br /> Contractor,Owner,and Owner's Representative shall meet as often as determined by the Owner's <br /> Representative,but no less often than once each month. The purpose of the meeting is to review Project <br /> status in relation to the construction schedule;review value of Work completed during the previous <br /> month; and,if applicable,review Contractor's plans to return Project status to that required by the <br /> schedule. If requested by the Owner or Owner's Representative,the Contractor shall submit a written <br /> progress report within five(5)days following this meeting, comprising: <br /> 1. The current construction schedule indicating percent complete,actual completion or start dates <br /> since the previous review,the estimated remaining duration for each activity in progress, <br /> Schedule of Values update,and narrative summary. <br /> 2. Reasons any activities are behind schedule and the corrective steps being taken. I <br /> GENERAL CONDITIONS 00 7200 - 14 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.