I <br /> POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> equipment, and work schedules to ensure completion of the Work within the Contract Time. Review by <br /> the Owner or Owner's Representative shall not constitute approval or acceptance of the Contractor's <br /> construction means,methods,sequencing,logic,order,precedence and succession of activities or <br /> Contractor's ability to complete the Work in a timely manner. Any mistakes or errors in any schedule, <br /> including,but not limited to,mistakes or errors of logic,order,precedence,and duration,are and remain <br /> the Contractor's. The Owner or Owner's Representative may comment upon the schedule. <br /> 5.2.2.2 Extensions of Contract Time <br /> 1 Any requests for extensions in Contract Time, whether resulting from Extra Work directed by the Owner <br /> or not,shall be accompanied by an analysis of schedules using the critical path method.This analysis <br /> shall include an updated schedule,an as-planned schedule,an as-built schedule,a but-for schedule,and <br /> narrative explaining the alleged causes, schedule impacts and all costs related to or arising out of the <br /> proposed extension.Any requests for extensions of Contract Time by the Contractor shall be submitted in <br /> accordance with these General Conditions. Extensions of Contract Time will be granted only as provided <br /> in the General Conditions and to the extent that affected critical activities exceed the Total Float time <br /> along the affected paths of the reviewed Preliminary Schedule at the time the change was authorized in <br /> writing by the Owner. Contractor has the burden of clearly and convincingly demonstrating entitlement <br /> to any adjustment of Contract Time. <br /> If the Owner is solely responsible for any Delay to Substantial Completion,Physical Completion, <br /> Completion Date,or Final Acceptance,the Contractor shall only be entitled to compensation or other <br /> damages as described in 12.4 REMEDIES,provided that Contractor timely gave Notice pursuant to 10. <br /> NOTICE TO OWNER,timely submitted a Contract Claim pursuant to 12. CONTRACT CLAIMS and <br /> fulfilled the requirements of 5.2.2. Construction Schedule. <br /> 5.2.3. Construction Progress <br /> The Contractor shall furnish all labor, materials, facilities and Equipment necessary to insure the <br /> prosecution and completion of the Project within the interim milestones, Substantial Completion, Physical <br /> Completion and Completion Dates of the Contract. If Work falls seven(7)days or more behind the <br /> reviewed Preliminary Schedule,the Contractor agrees that,at its sole cost and expense,it will take all <br /> actions necessary to return the Project to the accepted schedule. These actions may include the following: <br /> 1. Increase labor in quantities and crafts. <br /> 1 2. Increase the number of working hours per shift, shifts per working day,working days per week, <br /> or the amount of Equipment, or any combination of the foregoing. <br /> 3. Reschedule activities. <br /> If requested by the Owner's Representative,the Contractor shall prepare a proposed schedule revision <br /> demonstrating a plan to make up the lag in progress and insure completion of the Work within the <br /> Contract Time. All actions taken to return the Project to the accepted schedule are at the Contractor's <br /> expense. <br /> The Contractor shall pay all costs incurred by the Owner that result from the Contractor's action to return <br /> the Project to its accepted schedule,including,but not limited to,additional, overtime,or third party <br /> inspection,design and construction management service costs. Contractor agrees that Owner shall deduct <br /> such charges from payments due the Contractor. It is further understood and agreed that none of the <br /> I services performed by the Owner's Representative in monitoring,reviewing and reporting Project status <br /> and progress shall relieve the Contractor of responsibility for planning and managing construction Work <br /> in conformance with the construction schedule. <br /> I <br /> GENERAL CONDITIONS 00 7200- 17 <br /> I <br />