My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> After termination of the Contractor for default,the Owner may transfer performance of the Work to the <br /> Contractor's surety. The Owner may exclude the Contractor from the Site and take possession of the <br /> Work and all of the Contractor's tools,appliances,owned or rented construction equipment,and <br /> machinery at the Site and use the same to the full extent they could be used by the Contractor. The <br /> Owner may incorporate in the Work all materials and Equipment stored at the Site or for which the <br /> Owner has paid the Contractor,but which are not yet on Site. In such case,the Contractor will not be <br /> entitled to receive any further payment until the Work is finished. At the Owner's sole option, Contractor <br /> shall assign and transfer any contractual rights to material and Equipment to be installed, incorporated,or <br /> used in the performance of the Work. Owner shall credit Contractor for the reasonable fair market rental <br /> value of any and all Contractor owned equipment for so long as retained and used by the Owner. Owner <br /> shall credit Contractor for all materials and supplies on Site or on order,but not yet paid for by Owner, <br /> provided that ownership is transferred and assigned to the Owner and the materials and supplies conform <br /> to the requirements of the Contract Documents. <br /> If the unpaid balance of the Contract Sum exceeds the direct and indirect cost of the completed Work, <br /> including construction management services, such excess shall be paid to the Contractor. If such costs <br /> exceed such unpaid balance,the Contractor shall pay the difference to the Owner. Such costs incurred by <br /> the Owner will be verified by the Owner's Representative and incorporated into a Change Order,but in <br /> finishing the Work,the Owner may negotiate for materials,Equipment and services to complete the Work <br /> and will not be required to obtain the lowest figure for Work performed. <br /> Where the Contractor services have been so terminated by the Owner,the termination shall not affect any <br /> rights of the Owner against the Contractor then existing or which may thereafter accrue. Any retention or <br /> payment of monies due the Contractor by the Owner will not release the Contractor from liability. <br /> If the Owner terminates this agreement for default,and it is thereafter determined that the Contractor had <br /> not so failed to perform its obligations or defaulted in any way,the termination shall then be deemed to <br /> have been made for the convenience of the Owner pursuant to 5.4.2 Termination For Convenience. In <br /> that event,any adjustment of Contract Sum shall be in accordance with the General Conditions. <br /> The Contractor covenants and agrees that in the event suit is instituted by the Owner for any default on <br /> the part of the Contractor and the Contractor is adjudged by court of competent jurisdiction to be in <br /> default,the Contractor shall pay to the Owner all costs,expenses expended or incurred by the Owner in <br /> connection therewith. <br /> 5.4.2. Termination for Convenience <br /> Without prejudice to any other remedy it may have under law or and/or the provisions of the Contract,the <br /> Owner may terminate this Contract for convenience,with or without cause,in whole or in part,at any <br /> time by giving written notice to the Contractor. Termination will be effective upon receipt of such Notice <br /> by the Contractor. The Contractor shall immediately discontinue Work and take all reasonable steps with <br /> its suppliers and subcontractors to minimize cancellation charges and other costs. <br /> In the event of termination for convenience,the Contractor shall be compensated as provided in 9.2.3. <br /> Deleted Work. The Contractor will be entitled to no further payments whatsoever for the Work. <br /> In the event of a breach or default by the Contractor,Owner may,at its sole option, terminate this <br /> Contract in whole or in part for convenience as provided herein. The Owner may pursue any and all <br /> contractual, legal and equitable remedies for such breach or default. Absent an express written agreement <br /> to the contrary, a termination for the Owner's convenience shall not be deemed a waiver or release of any <br /> rights by the Owner nor shall the Owner be estopped from any legal or equitable remedies that may be <br /> appropriate. <br /> 5.4.3. Termination by Contractor after Suspension <br /> If the Work has been wholly suspended pursuant to 5.3.Suspension Procedures for more than ninety <br /> (90)days as measured from the date of the notice to suspend,then the Contractor may terminate this <br /> ' GENERAL CONDITIONS 00 7200- 19 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.