My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> Within fourteen(14)days from the receipt of such notice, the Contractor shall undertake the Work <br /> necessary to correct the deficiencies,and to comply with the Contract. If the Contractor disagrees with <br /> the Owner's Representative's determination and believes that the corrective Work should be covered by a <br /> Change Order,he or she shall immediately notify the Owner, in writing, setting forth its position. Within <br /> five(5) days after receipt of the Contractor's notification, the Owner will review the matter and notify the <br /> Contractor, in writing, of his or her determination. <br /> If the Owner determines that the corrective Work is required to comply with the Contract,the Contractor <br /> shall proceed with such Work. As a condition precedent to the Contractor's request for adjustment of <br /> Contract Sum,Contract Time,or both,resulting from the performance of such corrective Work,the <br /> Contractor shall,within fifteen(15)days after receipt of the Owner's determination,provide the Owner <br /> with Notice of a Contract Claim for an adjustment of Contract Sum,Contract Time, or both. Contract <br /> Claims not timely and completely submitted are deemed waived. The Contractor shall document the cost <br /> information associated with the corrective work with daily records in accordance with Force Account <br /> procedures and shall provide such information to the Owner's Representative daily. Receipt of the cost <br /> data by the Owner's Representative will not be construed to be an acceptance of the corrective Work,or <br /> an authorization for a Change Order to cover the corrective Work. Contractor waives any such Contract <br /> Claim by failing to maintain accurate and complete Force Account records. <br /> 8.7.2. Retention of Defective Work <br /> In its sole discretion,the Owner may retain Work that is not in compliance with the Contract. The Owner <br /> will determine the just and reasonable value for such defective Work and deductions will be made in the <br /> payments due or to become due to the Contractor. Final Acceptance will not act as a waiver of the <br /> Owner's right to recover from the Contractor an amount representing the deduction for retention of <br /> defective Work. <br /> 8.8. MATERIALS AND EQUIPMENT FURNISHED BY OWNER I <br /> Contractor shall install materials and Equipment furnished by the Owner as provided in the technical <br /> sections of the Specifications. Furnishing of material and Equipment by the Owner will be considered <br /> conclusive evidence of their acceptability for the purpose intended. If the Contractor discovers defects in <br /> material or Equipment furnished by the Owner,he or she shall immediately notify the Owner. After such <br /> discovery,the Contractor shall not proceed with Work involving Owner-furnished materials and <br /> Equipment unless authorized by the Owner. Unless otherwise noted or specifically stated,materials and <br /> Equipment furnished by the Owner,which are not of local occurrence or manufacture, are considered to <br /> be "FOB"railroad station or truck terminal nearest to the Site of the Work. At no cost to the Owner,the <br /> Contractor shall unload, transport, store, and protect such material and Equipment from damage. The <br /> Contractor shall inspect such Owner-furnished material and Equipment on receipt and provide the Owner <br /> with written acceptance for the incorporation of said material and Equipment into the Work. After receipt <br /> by the Contractor, the Contractor bears all risk of loss and casualty to Owner furnished materials and <br /> Equipment. <br /> 8.9. GUARANTEE <br /> The Contractor warrants to the Owner that all materials and Equipment furnished under this Contract will I <br /> be of highest quality and new unless otherwise specified by the Owner, free from faults and defects and in <br /> conformance with the Contract Documents.All Work not so conforming to these standards shall be <br /> considered defective. If required by the Owner's Representative,the Contractor shall furnish satisfactory111 <br /> evidence as to the kind and quality of materials and Equipment. <br /> The Work furnished must be of first quality and the workmanship must be the best obtainable in the <br /> various trades.The Workmust be of safe, substantial and durable construction in all respects. 111 <br /> Acceptance of the Work" <br /> shall not extinguish any covenant or agreement on the part of the Contractor to <br /> be performed or fulfilled under this Contract that has not, in fact,been performed or fulfilled at the time <br /> GENERAL CONDITIONS 00 7200-28 <br /> I <br />