My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> 2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the number of days <br /> (as contractually defined)of Contract performance. The result is the Daily Rate of Allocable <br /> Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office Overhead <br /> due to the project extension. This is accomplished by multiplying the Daily Rate of Allocable <br /> Overhead by the number of days of project extension caused solely by the Owner. This results in <br /> the Gross Amount of Additional Home Office Overhead Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders that are <br /> being presented and resolved concurrently with the subject calculation for Unabsorbed and/or <br /> Extended Home Office Overhead. The necessary adjustment would be to reduce the Gross <br /> Amount of Additional Home Office Overhead Compensation by any additional compensation for <br /> Overhead included in any direct cost claims being resolved concurrently with any claim for <br /> Extended and/or Unabsorbed Home Office Overhead. <br /> Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.6. FORCE ACCOUNT <br /> If Work or materials are to be paid for by Force Account,payment amounts will be determined and <br /> Contractor shall contemporaneously prepare,keep and maintain records segregated and allocated by time, <br /> location and item of Work in compliance with this subsection. Such records must be contemporaneously <br /> countersigned by the Owner or the Owner's Representative(or its designee). Any records not <br /> countersigned by the Owner or Owner's Representative shall be excluded from the calculation of payment <br /> under this subsection. <br /> The payments provided for herein shall be full payment for all Work done on a Force Account basis. The <br /> payment shall be deemed to cover all expenses of every nature,kind,and description, including all <br /> Overhead expenses,profit,occupational tax and any other Federal or State revenue acts,premiums on <br /> public liability and property damage insurance policies, and for the use of small tools and equipment for <br /> which no rental is allowed. <br /> No Contract Claim for Force Account shall be allowed except upon written order by the Owner's <br /> Representative for Extra Work prior to the performance of the Extra Work. No Extra Work shall be <br /> construed as Force Account Work that can be measured under the Specifications and paid for at the unit <br /> prices or lump sum named in the Contract. <br /> The Owner's Representative shall compute the amount and costs of any Work to be paid by Force <br /> Account,and the amount certified by the Owner's Representative shall be final as provided in 3.2. <br /> OWNER'S REPRESENTATIVE. <br /> The Contractor's wage,payroll, and cost records pertaining to Work paid for on a Force Account basis <br /> shall be open to inspection or audit as provided in 17.AUDITS. <br /> 9.6.1 Labor. I <br /> The Owner will reimburse the Contractor for labor and for supervision by foremen dedicated solely to the <br /> particular Force Account item of Work,but not for supervision by general superintendents or general <br /> foremen.The Owner's Representative will compute the labor payment on the basis of these four factors: <br /> 1. Weighted Wage Rate.The Weighted Wage Rate combines: <br /> a. the current basic wage and fringe benefits the Contractor is required and has agreed to pay, <br /> b. Federal Insurance Compensation(FICA), <br /> c. Federal Unemployment Tax Act(FUTA), and <br /> GENERAL CONDITIONS 00 7200 -36 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.