Laserfiche WebLink
i <br /> Field Report Report#: 65984 <br /> A.A.R.Testing Laboratory,Inc.7126180th Ave.N.E., Park 180,Suite C101,Redmond,WA 98052 I <br /> Phone 425.881.5812 Fax 425.881.5441 <br /> Client: Northwest Handling Systems,Inc. Project Number: 15-749 <br /> 1100 SW 7th St. Permit#: 81510-034 <br /> Renton,WA 98055-2939 <br /> Project Name: Funko, LLC <br /> Contact: Tony Johnson Address: 1202 Shuksan Way Bldg.#1 <br /> Inspection Performed: Proprietary Anchors <br /> Date: 12/7/2015 Time: Temperature: <br /> Anchor inspection, building 1. Inspected anchoring of rack system, lines 3 to 5/K-N and Z/8 to 12. <br /> 1)Anchors used, (2) 1/2"diameter per base plate. <br /> 2)All bolts torqued to above 40 ft. lbs. Verified with torque wrench#132E. <br /> All work completed in conformance with note 4 on page SCE 1 of and ESR 1917. <br /> Distribution: o Distribute Client ❑ Distribute Contractor <br /> ❑ Distribute Engineer FJ Distribute Owner Inspector: Panov,Krasimir <br /> C Distribute Municipality[,l Distribute Other Reviewed by: Michele Guerrini <br /> ❑ Distribute Architect [] Distribute Other <br /> All reports are considered confidential and are the property of the client and A.A.R.Testing Laboratory,Inc. <br /> Reproduction except in full without the written consent of A.A.R.Testing is strictly forbidden <br />