My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Verena Schwippert 8/15/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Verena Schwippert 8/15/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 9:44:59 AM
Creation date
8/31/2016 9:44:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Verena Schwippert
Approval Date
8/15/2016
End Date
5/3/2018
Department
Administration
Department Project Manager
Carol Thomas
Subject / Project Title
Loan of Dedicated to the Beauty of Earth
Tracking Number
0000257
Total Compensation
$1,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please note any handling instructions: <br /> Sculpture was delivered to the Schack Art Center and was installed May, 2016. <br /> 3. INSTALLATION AND REMOVAL <br /> Will you install and remove the Work? YesiKNo (x) <br /> What special requirements do you have for installation and removal of the work (e.g., pad, <br /> connections, crane) <br /> The City shall not pay Lender for installation and removal of the Work. The City shall directly <br /> or indirectly pay or arrange for third party services reasonably necessary for installation and <br /> removal of the Work, including, but not limited to, a crane. <br /> City of Everett Sculpture Loan Agreement <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.