Laserfiche WebLink
� � � <br />Bellevue • Bothell • Issaquah • Kenmore • Kirkland • Mercer Is/and • Sammamish • Snoqualmie • Woodinville <br />CONSTRUCTION TIP SHEET 2 <br />.� <br />NlyBuildin�Permit.com Handrails <br />October 2004 <br />Handrails are continuous for <br />the full length of the flight. <br />Handrails may be interrupted <br />by a newel post at a turn. <br />GENERAL INFORMATION: <br />2003 I RC <br />� <br />� <br />� <br />� / <br />� <br />� <br />� / <br />................... <br />..............:: � <br />Handrail ends returned' <br />to the wall or terminated <br />in newel posts or safety <br />terminals. i <br />Typical Handrail Elevation <br />R311.5.6 <br />The handrail may ^�^��^' <br />a maximum of 4- <br />required stair wid <br />1-1/2" minimum <br />Circular handrail� <br />than 1-1/4" or mo <br />in diameter. <br />The height of the <br />handrail is measured <br />vertically from the <br />sloped plane adjoining <br />the tread nosing. <br />Type I Handrails <br />R311.5.6.3 <br />The grippable <br />perimeter dimension is <br />4" minimum and 6-1/4" <br />maximum. <br />The non-circular <br />handrail cross section <br />is 2-1/4" maximum. <br />NOTE: <br />See page 2 for <br />additional handrail <br />grip shapes. <br />• Consult with your local planning department regarding requiretl setbacks. <br />• Obtain a building permit before starting construction. <br />• The intent of this sheet is to address the basics of private residential stair construction only and does not address <br />the subject in great detail. Additional information can be found at your local building department, home <br />improvement store, or library. <br />• This tip sheet is intended to show code requirements per the 2003 International Residential Code. <br />� <br />�CityGov.net <br />