My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1102 WETMORE AVE 2016-08-31
>
Address Records
>
WETMORE AVE
>
1102
>
1102 WETMORE AVE 2016-08-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 11:02:51 PM
Creation date
8/31/2016 11:09:48 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
1102
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
] <br />V <br />• <br />� <br />❑100 amp bus/100 amp main OCPD - 3,840 AC watts, maximum 20 amp inverter OCPD, <br />❑Other- Elec4rical Permit with Plan Review Required <br />Note 1: Listed un-altered factory main/bus combination. Alteration of the panelboard main OCPD will require p(an review. <br />Note 2: The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the maximum currents <br />ds calculated in 690.8(A). The rating or setting of overcurrent devices shall be permitted in accordance with 240.4(BJ ond (CJ.NEC <br />690.8(8J(1) , <br />Note 3: If a panelboard emp(oys a snap switch rated 30 amperes or less in any branch circuit, it cannot be rated more thon 200 <br />amperes unless there is a supply side overcurrent protection at Z00 amperes or less within the panelboard. This requirement does <br />not apply to panelboards equipped with circuitbreakers. Section 408.36(A) of the NEC. <br />7. I have attached the following Electrical One-Line Diagram: <br />❑Standard Electricaf Diagram- 6 Strings or Less <br />❑Standard Electrical Diagram- 4 Strings or Less <br />'�Standard Electrical Diagram- Micro Inverter <br />❑None of the above- Electrical Permit with Plan Review Required <br />Comments: <br />r,-..- � I�F you answered yes to all of the above questions, your project qualifies for over the Over-the- <br />_ "���i;�i'�afi' :�rC'�:4'B,��cl� E�2'u"��V�9':e <br />I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br />and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br />not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br />performance of construction. That I am authorized by the owner of this property to perform the work for which application is <br />made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br />Applicant Signature: <br />Applicant Name (Please �rint): -�'���,'�-��,k,1.�� �1����� , ���4,r � � <br />--------TO �� COMPLETED �Y CI�Y ST�4FF------ <br />Qualifies for O Building Permit? Yes 4No PermitApplicatio.n't•t n <br />Staff Initials Date: � I I'1 O� 1� i�' � O � 1., D�y� <br />� rN t I' > -, � ��i v <br />Qualifies for Ele ical OTC? '�Yes No <br />Staff Initials � Date: (�'�� <br />� <br />Permit #: <br />Date: +�� 1���`�- <br />1 <br />T'�n 1�' �L�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.