Laserfiche WebLink
INVOICE INFORMATION: <br /> PER AGREEMENT, CITY OF EVERETT SHARES 13.0% OF ITEM 1.1.1 COSTS (SEPA AND <br /> ANALYTICAL COSTS 2003 TO 2012) <br /> ITEM 1.1.1: SEPA AND STUDIES TO SUPPORT SEPA <br /> Associated <br /> Year Comment Cost <br /> CH2M Hill: Smith Island Restoration Project Preliminary <br /> 2006 Geotechnical Investigations and Collection of Existing Data $ 31,812 <br /> CH2M Hill: Channel Migration and Scour Evaluation. Everett <br /> Delta Natural Gas Pipeline/Smith island Restoration; <br /> Addendum: Preliminary Geotechnical Investigations and <br /> Collection of Existing Data Memorandum; Smith Island <br /> Restoration Project Dike Crossing at Williams Pipeline <br /> 2007 Preliminary Settlements Analysis $ 16,277 <br /> CH2M Hill: Revised Smith Island Restoration Project Dike <br /> 2008 Crossing at Williams Pipeline Preliminary Settlements Analysis $ 4,418 <br /> 2009 Landau: Cultural Resources Feasibility Study $ 31,363 <br /> 2009 County: Environmental Services $ 153,387 <br /> 2010 County: Environmental Services $ 82,863 <br /> 2011 County: Environmental Services $ 215,937 <br /> 2012 County: Environmental Services $ 155,504 <br /> 2012 County: Special study support (Tetra Tech studies below) $ 93,848 <br /> Tetra Tech: Union Slough, Geo/Hydrogeo,Salt water, <br /> 2012 Drainage studies $ 259,335 <br /> TOTAL <br /> $ 1,044,745 <br /> TOTAL ITEM 1.1.1 SEPA AND STUDIES TO SUPPORT SEPA COSTS: $ 1,044,745 <br /> CITY OF EVERETT 13.0% SHARE: <br /> 13.0% x $1,044,745 = $ 135,816.84. <br /> INTERGOVERNMENTAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 34 <br />