Laserfiche WebLink
Jan 24 16 01:06p Finish Line Heating 4063144684 p.1 <br /> Energy <br /> } t <br /> Duct Leakage Test results (Existing Construction) <br /> Mit�. <br /> Mouse address or lot number: 7 cf <br /> City: I L' - Y >< t Zip: ----- <br /> Cone. 19oor Area ( ): <br /> ❑ Duct tightness testing is not required for this residence per exceptions listed at the end of this document <br /> I <br /> fest Result: (--Z 'Z— CFM@25Pa i <br /> Ring (circle one): Open 1 _% 3 <br /> Duct Tester Location: <br /> Pressure Tap Location: , n !C III <br /> G certify that these duct leakage rates are accurate and determined using standard duct testing protocol <br /> Company game: <br /> i <br /> Duct Testing Technician:z s <br /> Technician Signature: Date: <br /> Phone Number: S 'Y ,_ <br /> IRlashington State Energy code Reference: <br /> R10Y,1.3.1 Mechanical Systems:When a space-conditioning system is altered by the installation or replacement of space-conditioning equipment(including <br /> replacement of the air handler,outdoor condensing unit of a split system air conditioner or heat pump,cooling or heating coil,or the furnace heat exchanger), <br /> the duct system that is connected to the new or replacement space-conditioning equipment shall be tested as specified in RS-33.The test results shall be <br /> provided to the building offioal and the homeowner. <br /> Exceptions: <br /> Duct systems that are documented to have been previously sealed as confirmed through field verification and diagnostic testing in accordance with <br /> procedures in RS-33. <br /> 2. Ducts with less than 40 linear feet in unconditioned spaces. <br /> 3. Existing ductsystems constructed,insulated orsealed with asbestos_ <br /> 4. Additions of less than 750 square feet. <br />