My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 76TH ST SW 2016-09-14
>
Address Records
>
76TH ST SW
>
12
>
12 76TH ST SW 2016-09-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2016 8:33:26 AM
Creation date
9/14/2016 8:33:13 AM
Metadata
Fields
Template:
Address Document
Street Name
76TH ST SW
Street Number
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 6/14/2010 <br /> Public Works Permit#: PW1006-017 <br /> City of Everett Public Works Department <br /> owl3200 Cedar Street Building Permit#; C1006-013'1', <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SANDAVOL C JR <br /> 12 76TH ST SW <br /> EVERETT WA <br /> PHONE: 4252905634 PHONE: <br /> TAX PARCEL ID# 00393500000106 SITE ADDRESS: 76TH ST SW <br /> DESCRIPTION OF PROPOSED WORK: <br /> NEW HOUSE W/A-T-� GARAGE <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 5. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to beginning <br /> the project. <br /> 6. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br /> swales, or erosion blankets. <br /> 7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 8. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br /> No wasting of material is allowed on this building lot. <br /> 9. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> C <br /> a <br /> TO POSTING <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> � r <br /> W) or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> Appr fof Cons do Date public property damaged thereby. <br /> INAL INSOPECTION Date <br /> Approved as Constructed Signature ofscant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.