Laserfiche WebLink
INSPECTION REPORT <br /> Date: 12 J Permit: <br /> K <br /> Contractor: <br /> Owner: YAM <br /> ISiteress: � 6 Z s�_ / , <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Gro ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> CElectrical <br /> ng rid ❑Drywall Nailing ❑ Plumbing Final <br /> Fina ❑Shear Nailing GAS PIPE <br /> WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: C—EP, <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> �cti.�c� Ana <AL4 <br /> Inspector: Date: L <br /> EIR(4/09) C�p RMS&PR MOTIONS•425/408-8900 <br />