Laserfiche WebLink
INSPECTION REPORT <br /> Date: J° �( ( � Permit: '14" 4 <br /> Contractor: <br /> A F1C-4— 10 <br /> Owner: Lewrl*-c_ <br /> Site Address: <br /> TYPE OF INSPECTION RE STED <br /> LECTRICAL BUILDING MECHICAL��R_ ggMBIN� <br /> ❑Temp <br /> ❑UFER ground ❑Groundwor <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ea <br /> ❑Drywall Nailing El Plumbing Final <br /> inal ❑Shear Nailing GAS PIPE <br /> Roof Nailing ElRough In/Service Hot Water Tank <br /> ns ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe{Final ElHWT Final <br /> OTHER OR CONSULTATION: 4?_ 3 Li 7v-7-S <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER IT <br /> ❑ OK FOR T.C.O. El CORRECTION REQUESTED <br /> E] OK FOR C.O. El VIOLATION <br /> F] UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: ,,,,.-7//J_ Date: 3 v 4 <br /> EIR(4/09) 4:;_ NATe RE 04RMS PROMOTIONS•425/x86-719.11 <br />