Laserfiche WebLink
pp- <br /> INSPECTION REPORT <br /> Date Permit: �v <br /> Contractor: <br /> Owner: <br /> Site Address: ' l)ai <br /> TYPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> it ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> oug ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ©—Service E]Framing ❑Rooftop Units E]Water Service <br /> Gr ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT CON LTATION: <br /> �FiOVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> F . .O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: r <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspecto • _I,/ Date:__ J <br /> E I R(10/06) DATABAR,INC. <br />