Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: F� I loo3— 1:7q <br /> @477- 'W, t <br /> Contractor: <br /> --?�. Owner:_LAY <br /> Site Address <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> unding E]Insulation ❑Mechanical Final El Medical Gas <br /> Cei 11 rid F]Drywall Nailing ElPlumbing Final <br /> Ctr,cal F al ❑Shear Nailing GAS PIPE <br /> SITE WO ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> g drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL TH <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> o <br /> Inspector: Date: <br /> EIR(4/09) 1 (,;n;_.ir <br />