Laserfiche WebLink
INSPECTION REPORT <br /> @4 <br /> Date: '5 Permit: <br /> �� Contractor: La <br /> ue -t <br /> e <br /> dt9r� ajwner: <br /> Site A : IU � U W `S -00 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> eCeilin rid ❑Drywall Nailing ❑Plumbing Final <br /> ectrical ina ❑Shear Nailing GAS PIPEE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> oti ains ❑Ceiling Grid ❑Refrigeration -1 Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final n HWT Final <br /> OTHER OR CONSULTATION: <br /> E] APPROVAL F-1 PARTIALAPPROVAL FINAL APPROVAL THIS P T <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: ► <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> ot,� .v C-r'YL[CAL <br /> Inspector: Date: <br /> FIR(4/09) FORMS PROMO710NS 425/4011-8900 <br />