Laserfiche WebLink
INSPECTION REPORT <br /> Date: AA-Z-411— Permit: /044 <br /> @4L77- --v---v— <br /> Contractor: C <br /> Owner <br /> Site Address: _ �6 O d <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑ <br /> Groundi a ❑Insulation ❑Mechanical Final ❑Medical Gas <br />/A!t!g ❑Drywall Nailing ❑Plumbing Final <br /> trical Fin ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> s ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVALTHI MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector- Date: Z <br /> EIR(4/09) /�A AT RE RMS X F OMOTIONS 325/308-8900 <br />