My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3314 CEDAR ST URENDA AUTO PAINTING 2016-09-20
>
Address Records
>
CEDAR ST
>
3314
>
URENDA AUTO PAINTING
>
3314 CEDAR ST URENDA AUTO PAINTING 2016-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 12:25:02 AM
Creation date
9/20/2016 10:54:22 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3314
Tenant Name
URENDA AUTO PAINTING
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br />,;` � '� it�t �t�rtrx�s <br />inounted in rubber isolators for smooth operation. The inotor, drive and bearings are <br />isolated from the exhaust air stream. This unit will utilize one 24" diameter fan driven by <br />a 3 HP inotor (208/230/460V/3PH/60HZ), operating at 9,500 SCFM at '/z" static pressure. <br />Total air exhausted will be 9,500 SCFM at '/z" static pressure <br />Personnel Access Door: <br />' One double wall 18-gauge galvanized steel personnel access door sized at 30" x 84" is <br />provided pre-hung in a heavy gauge steel frame ready for mounting to the spray booth. <br />The mounting hardware ineludes a panic type safety latch and 6" door pull. <br />Optional Exhaust Duct Package: <br />• 1- Auto Damper Stack Head <br />• 2- 3' Sections Plain Pipe <br />• 1- 3' Section of Plain Pipe with Cleanout Door <br />• 1 - Duct Connecting Ring <br />• 1- Roof Flashing with Storm Collar for pitched or flat roof as requested <br />The booth is ready to ship next business day after receiving your order. <br />The following inay be required for your equipment but are not included by A-Frame in this <br />proposal (unless specifically quoted): Installation, wiring, plumbing, fire protection, taxes and <br />permits. <br />Code Compliance: <br />• All A-Frame Spray Booths are designed to meet or exceed the requirements and <br />recommendations of the National Fire Protection Association (NFPA), Standard <br />Number 33 dated 2008, as well as the Occupational Health and Safety <br />Administration (OSHA) CFR 29.1910.107 covering the operation and construction <br />of spray booths. <br />Warranty: <br />A-Frame Paint Booths warrants to buyer that the equipment will be free from defects of <br />materials or workinanship under normal use and inaintenance for a period of one year. All <br />components supplied but not produced by A-Frame Paint Booths shall carry the warranty of the <br />manufacturer. <br />101 nGreenvillcAve <br />Suite 606 <br />Allen, TX 75002 <br />877-33R-3006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.