My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/04/27 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/04/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2016 10:10:04 AM
Creation date
5/9/2016 10:09:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERE T T CITY COUNCIL AGENDA ITEM COVER SHEET 6 <br /> PROJECT TITLE: j r <br /> An Ordinance closing a special Briefing COU1CIL BILL Cb1 ''�.1�T' <br /> improvement project entitled, Proposed Action Originating Department Public Works <br /> "Evergreen Way and Pecks Consent Contact Person Ryan Sass <br /> Drive - Intersection Safety," Action Phone Number (425) 257-8942 <br /> Fund 303, Program 099, as First Reading FOR AGENDA OF April 20,2016 <br /> established by Ordinance No. Second Reading <br /> 3321-13 Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) A)proval <br /> Evergreen Way and Final Acceptance: Proposed Ordinance Public Works <br /> Pecks Drive October 22,2014 <br /> Amount Budgeted $411,000 <br /> Expenditure Required $268,209 Account Number(s): PW 3544 <br /> Budget Remaining $142,791 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project constructed pedestrian and traffic signal safety improvements at the intersection of Evergreen <br /> Way and Pecks Drive. These improvements included left turn arrows,new traffic signal poles,traffic signal <br /> backplate visibility improvements, accessible pedestrian signals, street lighting improvements, pavement <br /> marking improvements, and Americans with Disability Act compliant curb ramps. <br /> The project cost was signincantly under the engineer's estimate due to utilizing existing conduits where <br /> available which avoided cutting and restoration expenses. <br /> The funding source for this project was: <br /> Federal Grant—Highway Safety Improvements (HSIP) $ 268,209 <br /> FE4i►_ I=•IT i.)- TIi:) ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.