Laserfiche WebLink
Total Cost <br /> Shared Cost Items County Share City Share (01) <br /> Item ILA Cost Element Percent Percent ($) <br /> Section (%) (%) <br /> F. Sales tax 8.6% County rate on $ 43,000 $ 6,000 $ 49,000 <br /> D.1.1.4 totals(3) <br /> G. SUBTOTAL E AND F. $ 1,956,000 $ 313,000 $ 2,269,000 <br /> H. 1.1.6 10% Unanticipated <br /> Costs on G $ 195,600 $ 31,300 $ 226,900 <br /> I. SUBTOTAL G. AND H. $ 2,151,600 $ 344,300 $ 2,495,900 <br /> J.. 1.1.5 Adaptive <br /> $ 1,305,000 $ 195,000 $ 1,500,000 <br /> Management(5) <br /> K. TOTAL BEFORE DIKE <br /> CONNECTION (SUBTOTAL I $ 3,456,600 $ 539,300 $ 3,995,900 <br /> AND J). <br /> L. 1.5 Dike Connection (4) 100% $ 130,000 $ 130,000 <br /> M. TOTAL COSTS (K AND L) $ 3,456,600 $ 669,300 $ 4,125,900 <br /> N. TOTAL COSTS, ROUNDED) $ 3,460,000 $ 670,000 $ 4,130,000 <br /> Notes: <br /> (1) Row and final totals rounded to $10k (except F.Sales tax and subsequent row totals); subtotals <br /> rounded to $1k. County 15%Admin Fee on labor. <br /> (2) Component cost associated with Section 1.6 <br /> (3)Sales tax for work on County land is County sales tax rate of 8.6%, on D.1.1.4 totals.Work is on County <br /> jurisdiction area. <br /> (4)Component cost associated with Section 1.5. Includes 9.2%City sales tax, 15% contingency, County <br /> Construction Management, Street Permit.The work quantities assume based on written agreement <br /> between the City and the County, are as follows: City to construct up to the north boundary of the 12th <br /> Street NE ROW, leaving a small gap on the top of new City dike for the County to fill and connect City and <br /> County dikes.Gap estimated to require 581 tons of fill, 131 tons of riprap, 88 tons of quarry spalls, and 155 <br /> sy of geotextile. Facing also required after gap work, on City dike on waterside of connection, estimated to <br /> require 1,298 tons of riprap, 865 tons of quarry spalls, 1,527 sy of geotextile, and 509 cy of topsoil type C. <br /> Listed as individual item in Exhibit B, as this is work City will pay for County to do. <br /> (5) Includes Dredging, excludes dike repair(County share= 87.0%, City share= 13.0%). No additional <br /> contingency. <br /> INTERGOVERNMENTAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 29 <br />