Laserfiche WebLink
• <br /> Northeast, a connection is required between the two setback <br /> dikes (the"Dike Connection"). The Dike Connection is <br /> included in Shared Work and is the joint connection between <br /> the City and the County setback dikes for the purpose of <br /> providing a smooth, seamless transition between the two dikes. <br /> 1.1.1.2 Protection Berm, for the regional gas pipeline on Smith Island <br /> 1.1.1.3 Adaptive management, which will continue after the <br /> completion of Smith Island Project. <br /> 1.1.2 Specific Exclusions from Shared Work—For the purposes of clarity, <br /> the parties agree that Shared Work does not include the following: <br /> 1.1.2.1 Ditch filling in the Smith Island-County area <br /> 1.1.2.2 Internal restoration elements <br /> 1.1.2.3 Work on City property, except for the Dike Connection <br /> 1.1.2.4 Any dike Breach and Related Work <br /> 1.1.2.5 Any removal of 12th Street <br /> 1.1.2.6 Ditch filling in the Smith Island-City area. <br /> 1.2 Breach and Related Work—The Breach and Related Work of the Smith Island <br /> Project is work related to two dike breaches in the Smith Island-County area and <br /> one dike breach in the Smith Island-City area, including related drainage, and <br /> channel work. The Breach and Related Work may also include some or all of <br /> the items excluded from Shared Work under Section 1.1 above. In general, the <br /> City is responsible for Breach and Related Work in Smith Island-City area, and <br /> the County is responsible for Breach and Related Work in Smith Island-County <br /> area. However, as described below, the parties intend that the County will bid <br /> and construct the Breach and Related Work in Smith Island-City area. In <br /> accordance with Section 2.10 below, construction by the County within the <br /> Smith Island-City area will also be subject to amendment to this Agreement or <br /> separate agreement identifying additional terms of such construction <br /> responsibilities, with the City reimbursing the County in full for such work. So <br /> as not to unreasonably delay the County's Breach and Related Work, the City <br /> will seek to obtain all permits for this work no later than the first quarter of <br /> 2017. <br /> Section 2. County Responsibilities. <br /> 2.1 Funding—The County will be responsible for: <br /> 2.1.1 Assembling funding from grants, mitigation projects, and County <br /> sources for the Smith Island Project, with the exception of the City's <br /> share of Smith Island Project costs as set forth in this Agreement. <br /> INTERLOCAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 4 <br />