My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 9/2/2016 (2)
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County 9/2/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:14 AM
Creation date
9/21/2016 11:59:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
9/2/2016
Council Approval Date
6/15/2016
Department
Public Works
Department Project Manager
Jim Miller
Subject / Project Title
Smith Island Restoration Project
Tracking Number
0000273
Total Compensation
$683,900.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Snohomish County 3/24/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Interlocal Agreements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 SEPA Review—The City will cooperate with the County in supporting the <br /> SEPA process for the Smith Island Project referenced in Section 2.2, including <br /> City staff assistance in all work contributing to preparation of the Final EIS and <br /> work involved in responses to any challenges, excluding actual legal costs. <br /> 3.3 Design of Smith Island Project—The City is responsible for the design of <br /> Breach and Related Work in the Smith Island-City area. This design is in <br /> accordance with Section 4 below. The City is not responsible for design of any <br /> Shared Work and the City is not responsible for design of Breach and Related <br /> Work in the Smith Island-County area. <br /> 3.4 Permitting of Smith Island Project—The City will obtain all necessary permits <br /> for work to be completed in the Smith Island-City area. Since it is intended that <br /> the County will perform construction of Breach and Related work in the Smith <br /> Island-City area, County contractor compliance with such permits will be <br /> addressed by amendment to this agreement or separate agreement per Section <br /> 2.10. The County will assist the City in obtaining such permits for County <br /> contractor work as applicable in the Smith Island-City area. <br /> 3.5 Construction of Smith Island Project— <br /> 3.5.1 Shared Work. The City will cooperate with the County in the County's <br /> construction of the Shared Work. In connection with the Dike <br /> Connection, the City will provide the County with the City's available <br /> compaction results. <br /> 3.5.2 Breach and Related Work. The City will cooperate with the County in <br /> the County's construction of the Breach and Related Work. The City <br /> will comply with Exhibit C with respect to the County's construction of <br /> Breach and Related Work in the Smith Island-County area. <br /> 3.6 Public Outreach—The City will support the County on public outreach efforts, <br /> including but not limited to the following by way of illustration: <br /> • Attend County meetings to promote the Smith Island Project <br /> • Represent the City in such meetings as partner on the Smith Island <br /> Project <br /> 3.7 Access—Should easements be needed for access to City property, and such <br /> access is not possible via City or County property, the City will obtain all such <br /> easements and associated agreements. <br /> 3.8 Prior Completion of City Setback Dike, Breach and Starter Channels—The <br /> parties acknowledges that the City is completing certain work on City property <br /> in Smith Island, relating to the City setback dike and drainage. This work is not <br /> part of the Smith Island Project,but is closely related to it. The City will be <br /> completely responsible for the design,permitting and construction and <br /> associated costs of all such work on City property, including but not limited to <br /> the following: funding, SEPA review, design, design coordination with the <br /> INTERLOCAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.