My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burlington Northern Santa Fe (BNSF) 8/29/2016
>
Contracts
>
Agreement
>
Burlington Northern Santa Fe (BNSF) 8/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:56:21 AM
Creation date
9/26/2016 10:55:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burlington Northern Santa Fe (BNSF)
Approval Date
8/29/2016
Council Approval Date
8/24/2016
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Overpass
Tracking Number
0000281
Total Compensation
$70,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AirffarSAlm- <br /> AA/L WAY <br /> must be back filled as soon as possible. <br /> 1.08 Hazardous Waste, Substances and Material Reporting: <br /> • 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, <br /> petroleum or other deleterious material, including but not limited to any <br /> non-containerized commodity or material, on or adjacent to Railway's Property, in or <br /> near any surface water, swamp, wetlands or waterways, while performing any work <br /> under this Agreement, Contractor must immediately: (a) notify the Railway's <br /> Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take <br /> safeguards necessary to protect its employees, subcontractors, agents and/or third <br /> parties: and (c) exercise due care with respect to the release, including the taking of <br /> any appropriate measure to minimize the impact of such release. <br /> 1.09 Personal Injury Reporting <br /> • 1.09.01 The Railway is required to report certain injuries as a part of compliance <br /> with Federal Railroad Administration (FRA) reporting requirements. Any personal <br /> injury sustained by an employee of the Contractor, subcontractor or Contractor's <br /> invitees while on the Railway's Property must be reported immediately (by phone <br /> mail if unable to contact in person) to the Railway's representative in charge of the <br /> project. The Non-Employee Personal Injury Data Collection Form contained herein <br /> is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the <br /> Railway's Project Representative no later than the close of shift on the date of the <br /> injury. <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.