My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burlington Northern Santa Fe (BNSF) 8/29/2016
>
Contracts
>
Agreement
>
Burlington Northern Santa Fe (BNSF) 8/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:56:21 AM
Creation date
9/26/2016 10:55:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burlington Northern Santa Fe (BNSF)
Approval Date
8/29/2016
Council Approval Date
8/24/2016
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Overpass
Tracking Number
0000281
Total Compensation
$70,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that the plans and specifications meet the subjective standards of BNSF, and such <br /> approval by BNSF shall not be deemed to mean that the plans and specifications or <br /> construction is structurally sound and appropriate or that such plans and specifications <br /> meet applicable regulations, laws, statutes or local ordinances and/or building codes. <br /> 2. Agency must make any required application and obtain all required permits and <br /> approvals for the construction of the Project. <br /> 3. Agency must provide for and maintain minimum vertical and horizontal <br /> clearances, as required in Exhibit C and as approved by BNSF as part of the plans and <br /> specifications for the Project. <br /> 4. Agency must acquire all rights of way necessary for the construction of the <br /> Project. <br /> 5. Agency must make any and all arrangements, in compliance with BNSF's Utility <br /> Accommodation Manual (http://www.bnsf.com/communities/faqs/pdf/utilitv.pdf), for the <br /> installation or relocation of wire lines, pipe lines and other facilities owned by private <br /> persons, companies, corporations, political subdivisions or public utilities other than <br /> BNSF which may be necessary for the construction of the Project.. <br /> 6. Agency must construct the Project as shown on the attached Exhibit A and do all <br /> work ("Agency's Work") provided for in the plans and specifications for the Project, <br /> except railroad work that will be performed by BNSF hereunder. Agency must furnish <br /> all labor, materials, tools and equipment for the performance of Agency's Work. The <br /> principal elements of Agency's Work are as follows: <br /> (a) Construction of the Structure; <br /> (b) All necessary grading and paving, including backfill of excavations and <br /> restoration of disturbed vegetation on BNSF's right-of-way; <br /> (c) Provide suitable drainage, both temporary and permanent; <br /> (d) Intentionally left blank. <br /> (e) Intentionally left blank. <br /> (f) Intentionally left blank. <br /> (g) Provide appropriate pedestrian control during construction; <br /> (h) Intentionally left blank. <br /> (i) Installation and maintenance of an 8-ft. high fence and/or concrete <br /> combination (throw fence) on the outside barrier of the Structure; <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.