Laserfiche WebLink
that the plans and specifications meet the subjective standards of BNSF, and such <br /> approval by BNSF shall not be deemed to mean that the plans and specifications or <br /> construction is structurally sound and appropriate or that such plans and specifications <br /> meet applicable regulations, laws, statutes or local ordinances and/or building codes. <br /> 2. Agency must make any required application and obtain all required permits and <br /> approvals for the construction of the Project. <br /> 3. Agency must provide for and maintain minimum vertical and horizontal <br /> clearances, as required in Exhibit C and as approved by BNSF as part of the plans and <br /> specifications for the Project. <br /> 4. Agency must acquire all rights of way necessary for the construction of the <br /> Project. <br /> 5. Agency must make any and all arrangements, in compliance with BNSF's Utility <br /> Accommodation Manual (http://www.bnsf.com/communities/faqs/pdf/utilitv.pdf), for the <br /> installation or relocation of wire lines, pipe lines and other facilities owned by private <br /> persons, companies, corporations, political subdivisions or public utilities other than <br /> BNSF which may be necessary for the construction of the Project.. <br /> 6. Agency must construct the Project as shown on the attached Exhibit A and do all <br /> work ("Agency's Work") provided for in the plans and specifications for the Project, <br /> except railroad work that will be performed by BNSF hereunder. Agency must furnish <br /> all labor, materials, tools and equipment for the performance of Agency's Work. The <br /> principal elements of Agency's Work are as follows: <br /> (a) Construction of the Structure; <br /> (b) All necessary grading and paving, including backfill of excavations and <br /> restoration of disturbed vegetation on BNSF's right-of-way; <br /> (c) Provide suitable drainage, both temporary and permanent; <br /> (d) Intentionally left blank. <br /> (e) Intentionally left blank. <br /> (f) Intentionally left blank. <br /> (g) Provide appropriate pedestrian control during construction; <br /> (h) Intentionally left blank. <br /> (i) Installation and maintenance of an 8-ft. high fence and/or concrete <br /> combination (throw fence) on the outside barrier of the Structure; <br /> 5 <br />