Laserfiche WebLink
Section l: Chapter 4 3(B), 2001 (EMC 15.16.080.A.18) of Ordinance No. 2530-01 (EMC <br /> 15.16.080.A.18), which reads as follows: <br /> Decisions included <br /> 18. Land divisions, as follows: <br /> a. Binding site plan variance (twenty-five percent or less); <br /> b. Preliminary binding site plan; <br /> c. Preliminary binding site plan with site plan approval; <br /> d. Preliminary residential condominium binding site plan; <br /> e. Preliminary short subdivision alteration or vacation; <br /> f. Preliminary short subdivision of nine lots or less; <br /> g. Preliminary short subdivision with nonconforming structures; <br /> h. Preliminary subdivision of fifty lots or less; <br /> i. *Preliminary subdivision alteration or vacation; <br /> j. Subdivision or short subdivision variance and variance for tax lots (twenty-five <br /> percent or less) (see tax segregated lots in EMC Title 18, Land Division); <br /> is hereby amended to read as follows: <br /> Decisions included <br /> 18. Land divisions, as follows: <br /> a. Preliminary binding site plan; <br /> b. Preliminary binding site plan with site plan approval; <br /> c. Preliminary residential condominium binding site plan; <br /> d. Preliminary short subdivision alteration or vacation; <br /> e. Preliminary short subdivision of nine lots or less; <br /> f. Preliminary short subdivision with nonconforming structures; <br /> g. Preliminary subdivision of fifty lots or less; <br /> h. Preliminary subdivision alteration or vacation; <br /> i. Subdivision or short subdivision variance as provided by EMC 18.32.010.; <br /> Section 2: Chapter 4 4(B) of Ordinance No. 2530-01 (EMC 15.16.110.A.9), which reads as <br /> follows: <br /> Review Process IIIA <br /> 9. Land divisions, as follows: <br /> a. Binding site plan variance of more than twenty-five percent; <br /> b. Preliminary cluster subdivision or cluster short subdivision; <br /> c. Preliminary subdivision of more than fifty lots; <br /> d. Preliminary subdivision of fifty lots or less if an open public hearing is required (see <br /> footnote on Review Process II, EMC 15.16.080); <br />